Ameresco, Juneau Hydropower Announce $240M Alaska Hydropower Project
Ameresco, Juneau Hydropower Announce $240M Alaska Hydropower Project

Ameresco, Juneau Hydropower Announce $240M Alaska Hydropower Project

News summary

Ameresco has partnered with Juneau Hydropower to develop, construct, and operate a 19.8 MW hydroelectric facility at Sweetheart Lake, Alaska, designed to generate approximately 116,000 megawatt-hours annually, increasing Juneau's baseload clean hydropower by 20%. The $240 million project includes a battery energy storage system, over 40 miles of high-voltage transmission infrastructure with an eight-mile undersea cable crossing Gilbert Bay, and an interconnection substation, enhancing grid reliability and energy security for Alaska's capital. It aims to connect remote areas previously dependent on diesel generation to renewable energy sources, reducing CO2 emissions by an estimated 82,012 metric tons annually. The facility will support local industries such as Coeur Alaska’s Kensington Mine in transitioning to renewable energy, addressing past power outages caused by extreme weather events. Duff Mitchell, Managing Director of Juneau Hydropower, described the project as a catalyst for sustained growth and prosperity, emphasizing its design to produce reliable energy even in dry years. Ameresco will also provide long-term operations and maintenance to ensure continued performance and energy resiliency.

Story Coverage
Bias Distribution
100% Unrated
Information Sources
Coverage Details
Total News Sources
1
Left
0
Center
0
Right
0
Unrated
1
Last Updated
9 days ago
Bias Distribution
100% Unrated
Related News
Daily Index

Negative

22Serious

Neutral

Optimistic

Positive

Ask VT AI
Story Coverage
Subscribe

Stay in the know

Get the latest news, exclusive insights, and curated content delivered straight to your inbox.

Present

Gift Subscriptions

The perfect gift for understanding
news from all angles.

Related News
Recommended News